Clients
- Cecon Contracting
Location
- India (East Coast / Dhirubhai-1 Field)
Scope
- Design and engineering of a custom buoyancy module recovery catcher (2-part structure)
- Payload capacity of 25Te, designed according to DNVGL-ST-E273
- Integration of a hinged hatch and heavy-duty net for secure module containment and retrieval
- Detailed CFD analyses (ANSYS and OpenFOAM) to determine terminal velocity, impact energy, stability, and drag forces
- Physical scale testing to verify CFD analytical results
- Engineering support for the decommissioning of risers and umbilicals at FPSO Dhirubhai-1
Year
- 2020





